Challenge : In the first five years, recurring maintenance work with intensive tile replacement was required in the lower half of the first pass due to continuous material oxidation during waste incineration.
Supervised by Saint-Gobain Performance Ceramics & Refractories international team comprising professionals from Germany, France and India, the refractory installation was completed diligently over two consecutive 10-day periods.
Challenge: The questions around boiler ash hoppers and how Saint-Gobain monolithic materials represent the ideal long-term waste to energy solution to costly breakdown, maintenance and repair issues.
Challenge:The castables has to be resistant to erosion and impact due to metal pouring into the ladle. It needs as well to reduce the ladle patching and repair.
Challenge: The old system with potential for the heavy ash / slag build-up in upper levels falling could endangering personnel when they entered the boiler.